| S.No |
 |
Tender Date |
 |
Subject |
 |
Tender No. |
 |
Closing
Date
|
 |
| 170 |
 |
25th July, 2008 |
 |
PROCUREMENT OF PCV SPARES |
 |
GAIL/BDA/08/025/3200045423/ID/05
|
 |
1400 (IST) on 12th August, 2008 |
 |
| 169 |
 |
25th July, 2008 |
 |
RENOVATION OF 1ST FLOOR (BIS SECTION) AT GAIL BHAWAN , NEW DELHI |
 |
GAIL/ND/HR-C&P/08/0005
|
 |
1400 (IST) on 14th August, 2008 |
 |
| 168 |
 |
24th July, 2008 |
 |
PROCUREMENT OF LIGHTING CONSUMABLES |
 |
GAIL/US/08/P026/3200045402/FL-042/08-09
|
 |
1400 (IST) on 16th August, 2008 |
 |
| 167 |
 |
24th July, 2008 |
 |
TRANSPORTATION OF APPRX. 780 MT OF CYCLOHEXANE FROM M/S GSFC, VADODARA TO GAIL PATA (U.P.) IN ROAD TANKERS |
 |
GAIL/PA08/18920/3300025757/SD
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 166 |
 |
24th July, 2008 |
 |
HIRING OF 20 KVA DG SET FOR ADMINISTRATIVE BUILDING & GUEST
HOUSE |
 |
GAIL/20019109PK/3300025788/AGT/C&P/7/26
|
 |
1400 (IST) on 9th August, 2008 |
 |
| 165 |
 |
24th July, 2008 |
 |
TRANSPORTATION OF SURPLUS/SCRAP MATERIAL FROM
KAKINADA TERMINALS TO GAIL RAJAHMUNDRY
STORES |
 |
GAIL/08/RJ19222/3300025774/
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 164 |
 |
24th July, 2008 |
 |
DISPOSAL OF PLANT GENERATED SCRAP (USED INDUSTRIAL BATTERIES) LYING AT GAIL, KHERA
COMPRSSOR STATION CHIKLI, Ujjain ON ÄS IS WHERE IS AND NO COMPLAINT BASIS |
 |
GAIL/KCS/C&P/SCRAP-03/ 2008-09
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 163 |
 |
24th July, 2008 |
 |
DISPOSAL OF PLANT GENERATED SCRAP (USED OIL) LYING AT GAIL, KHERA COMPRSSOR
STATION CHIKLI, UJJAIN ON ÄS IS WHERE IS AND NO COMPLAINT BASIS
|
 |
GAIL/KCS/C&P/SCRAP-02/ 2008-09
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 162 |
 |
24th July, 2008 |
 |
DISPOSAL OF PLANT GENERATED SCRAP LYING AT GAIL, KHERA COMPRSSOR STATION CHIKLI,
Ujjain ON ÄS IS WHERE IS AND NO COMPLAINT BASIS
|
 |
GAIL/KCS/C&P/SCRAP-01/ 2008-09
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 161 |
 |
24th July, 2008 |
 |
FILTER ELEMENT
|
 |
GAIL/08/RJ19202/3200045412/
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 160 |
 |
24th July, 2008 |
 |
INSTALLATION OF NEW SWITCHGEAR PANEL AND
LIGHTING DISTRIBUTION BOARD AT VIJJESWARAM
TERMINAL OF KG BASIN
|
 |
GAIL/08/RJ19273/3300025765/
|
 |
1400 (IST) on 08th August, 2008 |
 |
| 159 |
 |
24th July, 2008 |
 |
PROCUREMENT OF LAPTOP PC UNDER BUY BACK AT GAIL, CAUVERY BASIN
|
 |
GAIL/PY/08/8256/3200045389/2008002
|
 |
1400 (IST) on 14th August, 2008 |
 |
| 158 |
 |
24th July, 2008 |
 |
OVERALL MIGRATION TEST & UNDUE TOXICITY
|
 |
GAIL/ND/MKT-C&P/PC MKT/ 22 /2008
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 157 |
 |
23rd July, 2008 |
 |
PRINTING AND SUPPLY OF LOG BOOKS AND LOG SHEETS
|
 |
GAIL/US/08/P024/3200045315/FL-055/08-09
|
 |
1400 (IST) on 16th August, 2008 |
 |
| 156 |
 |
23rd July, 2008 |
 |
PROCUREMENT OF STEEL STRUCTURES
|
 |
GAIL/US/08/P025/3200045342/FL-054/08-09
|
 |
1400 (IST) on 16th August, 2008 |
 |
| 155 |
 |
23rd July, 2008 |
 |
CONSTRUCTION OF PEDSTALS IN CENTRAL WARE HOUSE GAIL, VAGHODIA
FOR STACKING OF LINE PIPE
|
 |
GAIL/VAG/18885//3300025738/C&P/C/W-012
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 154 |
 |
23rd July, 2008 |
 |
PROCUREMENT OF V-BELTS AND HTD BELTS
|
 |
GAIL/US/08/P023/3200045270/FL-049/08-09
|
 |
1400 (IST) on 16th August, 2008 |
 |
| 153 |
 |
23rd July, 2008 |
 |
BATTERIES
|
 |
GAIL/08/RJ19179/3200045356/
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 152 |
 |
23rd July, 2008 |
 |
ANNEXURE-1 ATTACHED FOR SCOPE OF WORK AND SPECIAL CONDITION OF
CONTRACT,ANNEXURE-2 TECHNICAL DETAILS OF MASTERS |
 |
GAIL/08/RJ19140/3300025749/
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 151 |
 |
22nd July, 2008 |
 |
PROCUREMENT OF PORTABLE FIRE PUMP
|
 |
GAIL/BDA/08/023/3200045252/ID/04
|
 |
1400 (IST) on 12th August, 2008 |
 |
| 150 |
 |
22nd July, 2008 |
 |
Hiring of 1 x E1 Capacity between Noida/Delhi & Vijaywada for GAILTel-NMC, Noida |
 |
GAIL/NOIDA/C&P/8019
|
 |
1400 (IST) on 12th August, 2008 |
 |
| 149 |
 |
22nd July, 2008 |
 |
P/F CHAINLINK FENCING AND CONSTRUCTION OF SHED
AT GAIL (INDIA) LIMITED,VIJAIPUR |
 |
GAIL/VL/08/C040/3300025705/CIVIL
|
 |
1400 (IST) on 12th August, 2008 |
 |
| 148 |
 |
22nd July, 2008 |
 |
PROCUREMENT OF BATTERIES |
 |
GAIL/US/08/P022/3200045259/FL-028/08-09
|
 |
1400 (IST) on 16th August, 2008 |
 |
| 147 |
 |
22nd July, 2008 |
 |
PROCUREMENT OF SPARE BEARING RTD FOR GAS TURBINE COMPRESSORS |
 |
GAIL/VL/08/M080/3200045211/INST
|
 |
1400 (IST) on 19th August, 2008 |
 |
| 146 |
 |
22nd July, 2008 |
 |
PROCUREMENT OF WELDING ELECTRODES |
 |
GAIL/VAG/19153
/3200045229/C&P/M/25/LPG
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 145 |
 |
22nd July, 2008 |
 |
PROCUREMENT OF SPLIT AIR CONDITIONERS |
 |
GAIL/KCS/08/60 /3200045230/Elect
|
 |
1400 (IST) on 12th August, 2008 |
 |
| 144 |
 |
22nd July, 2008 |
 |
PROCUREMENT OF BALL VALVES (API 6D) CATEGORY-III FOR VIJAIPUR-DADRI-BAWANA PIPELINE PROJECT
» 1. commercial
» 2. Technical |
 |
SST/6921-060-qv-mr-9080/1012
|
 |
1200 (IST) on 20th August, 2008 |
| -- |
 |
-- |
 |
Corrigendum No: 1 |
 |
SST/6921-060-qv-mr-9080/1012
|
 |
1200 (IST) on 20th August, 2008 |
 |
| 143 |
 |
22nd July, 2008 |
 |
SERVICE CONTRACT FOR CHEMICAL AND MATERIAL HANDLING CONTRACT AT GAIL, PATA |
 |
GAIL/PATA/C&P/PSER/20018882/SR
|
 |
1500 (IST) on 19th August, 2008 |
 |
| 142 |
 |
22nd July, 2008 |
 |
PROCUREMENT OF PRINTER CARTRIDGES / TONERS FOR BCPL, LEPETKATA
|
 |
BCPL/C&P/2008/M/04/AB
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 141 |
 |
21st July, 2008 |
 |
PROCUREMENT OF CARTRIDGE AT VIZAG |
 |
GAIL/VIZ/018549/3200045184/VIZAG/
|
 |
1400 (IST) on 12th August, 2008 |
 |
| 140 |
 |
21st July, 2008 |
 |
HOUSE KEEPING SERVICES AT GAIL IPS ABU ROAD |
 |
GAIL/FL-005/SER/3300025661/AB/C&P/08-09
|
 |
1400 (IST) on 8th August, 2008 |
 |
| 139 |
 |
21st July, 2008 |
 |
Transportation of 1620 MT of Wash Oil (Liquid Hydrocarbon product) from
various locations to GAIL PATA (U.P.) in Road Tankers |
 |
GAIL/PA08/19021/3300025688/SD
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 138 |
 |
21st July, 2008 |
 |
PROCUREMENT OF VALVES
|
 |
GAIL/HZR/FL-P28/3200045189/SG
|
 |
1400 (IST) on 13th August, 2008 |
 |
| 137 |
 |
21st July, 2008 |
 |
RATE CUM MAINTENNACE CONTRACT FOR TELECOM SYSTEMS AND ITS
SUPPORTING CABLE NETWORK IN THAL & MUMBAI REGION
|
 |
GAIL/MU/08/C05/3300025689/
|
 |
1400 (IST) on 12th August, 2008 |
 |
| 136 |
 |
21st July, 2008 |
 |
SUPPLY OF AA STABILIZER (QUANTITY: 28 MT)
|
 |
GAIL/PA08/18321/3200045178/SD
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 135 |
 |
21st July, 2008 |
 |
SUPPLY OF HD STABILIZER (QUANTITY: 9.6 MT) |
 |
GAIL/PA08/18927/3200045180/SD
|
 |
1500 (IST) on 12th August, 2008 |
 |
| 134 |
 |
21st July, 2008 |
 |
SUPPLY OF POLYMER PROCESSING AID (QUANTITY: 180 MT) |
 |
GAIL/PA08/18700/3200045179/SD
|
 |
1500 (IST) on 19th August, 2008 |
 |
| 133 |
 |
19th July, 2008 |
 |
ANNUAL MAINTENANCE OF GAIL OPTICAL FIBRE CABLE NETWORK LAID
UNDER HAZIRA MAINTENANCE JURISDICTION FOR A PERIOD OF TWO YEARS |
 |
GAIL/HZR/FL-C18/3300025671/SG |
 |
1400 (IST) on 13th August, 2008 |
 |
| 132 |
 |
19th July, 2008 |
 |
Proc. of Bore Well & GI Pipe with Flange |
 |
GAIL/ABR/FL-009/3200045154/C&P/PR/08-09 |
 |
1400 (IST) on 08th August, 2008 |
 |
| 131 |
 |
19th July, 2008 |
 |
Proc. of for Power Contactor |
 |
GAIL/ABR/FL-010/3200045171/C&P/PR/08-09 |
 |
1400 (IST) on 11th August, 2008 |
 |
| 130 |
 |
19th July, 2008 |
 |
Calibration of Master Instruments at GAIL,Cauvery basin |
 |
GAIL/PY/08/9081/3300025670/2K8012 |
 |
1400 (IST) on 11th August, 2008 |
 |
| 129 |
 |
19th July, 2008 |
 |
Proc. of the membranes for R.O. Plant Set |
 |
GAIL/ABR/FL-008/3200045164/C&P/PR/08-09 |
 |
1400 (IST) on 08th August, 2008 |
 |
| 128 |
 |
18th July, 2008 |
 |
PROCUREMENT OF PIPE FITTINGS FOR GAIL COMPRESSOR STATION HAZIRA
|
 |
GAIL/HZR/FL-P27/3200045139/SG |
 |
1400 (IST) on 13th August, 2008 |
 |
| 127 |
 |
18th July, 2008 |
 |
Examination/Testing of Pressure Vessels, Pressure Piping, Valves,Lifting machines.etc under factories Act for Khera Compressor Station |
 |
GAIL/KCS/09/C10/3300025650/Pipeline |
 |
1400 (IST) on 05th August, 2008 |
 |
| 126 |
 |
18th July, 2008 |
 |
Updating of the presentation on GAIL (O&M) activities for GAIL, NGMC, Noida |
 |
GAIL/NOIDA/C&P/8020 |
 |
1400 (IST) on 1st August, 2008 |
 |
| 125 |
 |
18th July, 2008 |
 |
SITE GRADING-I WORK FOR BRAHMAPUTRA
PETROCHEMICAL COMPLEX OF M/s BRAHMAPUTRA
CRACKER AND POLYMER LIMITED |
 |
6907/T-149/07-08 /SPL/17 |
 |
1600 (IST) on 19th August, 2008 |
 |
| 124 |
 |
18th July, 2008 |
 |
ANNUAL MAINTENANCE CONTRACT
FOR CIVIL WORKS AT GTI NOIDA |
 |
GAIL/GTI/C&P/2K08-20/2008 |
 |
1400 (IST) on 08th August, 2008 |
 |
| 123 |
 |
18th July, 2008 |
 |
Marine, Fire & CPM Insurance Cover for GAIL, Pata for the year 2008-09 |
 |
GAIL/PATA/PSER/20019032/F&A |
 |
1400 (IST) on 06th August, 2008 |
 |
| 122 |
 |
18th July, 2008 |
 |
CALIBRATION OF MASTER INSTRUMENT |
 |
GAIL/AG/08/0208/3300025642/JBS/C&P/ |
 |
1400 (IST) on 12th August, 2008 |
 |
| 121 |
 |
18th July, 2008 |
 |
Procurement of Xerox Machine |
 |
GAIL/NOIDA/8021/3200045117/ |
 |
1400 (IST) on 1st August, 2008 |
 |
| 120 |
 |
17th July, 2008 |
 |
OVERHAULING OF TRANSFORMERS AT IPS- SAMAKHIALI |
 |
GAIL/SA/07/SR17/3300025630/RC/2008-09 |
 |
1400 (IST) on 8th August, 2008 |
 |
| 119 |
 |
17th July, 2008 |
 |
SUPPLY AND INSTALLATION OF 03" HF PULSER(PROBE) FOR TURBINE METER |
 |
GAIL/VH/08/M062/3400000275/P/L |
 |
1400 (IST) on 13th August, 2008 |
 |
| 118 |
 |
17th July, 2008 |
 |
ELECTRICAL MAINTENANCE CONTRACT FOR TOWNSHIP
& PLANT AT GAIL [INDIA] LIMITED, VIJAIPUR |
 |
GAIL/VL/08/C066/3300025632/ELECT |
 |
1400 (IST) on 12th August, 2008 |
 |
| 117 |
 |
17th July, 2008 |
 |
ORDINARY WATER |
 |
GAIL/FL-004/PUR/3200045110/NBD/C&P/08 |
 |
1400 (IST) on 08th August, 2008 |
 |
| 116 |
 |
17th July, 2008 |
 |
PROCUREMENT OF NON-SPARKING TOOLS FOR GAIL, PATA |
 |
GAIL/PA08/17503/3200044365/KN |
 |
1500 (IST) on 19th August, 2008 |
 |
| 115 |
 |
17th July, 2008 |
 |
SECURITY SEALS |
 |
GAIL/AG/08/0015/3200045109/JBS/C&P/ |
 |
1400 (IST) on 5th August, 2008 |
 |
| 114 |
 |
17th July, 2008 |
 |
SERVICE CONTRACT FOR CHEMICAL HANDLING JOB IN GPU AT GAIL, PATA |
 |
GAIL/PATA/C&P/PSER/20018244/SR |
 |
1500 (IST) on 15th August, 2008 |
 |
| 113 |
 |
17th July, 2008 |
 |
OPERATION OF PLASTIC SCRAP GRINDER MACHINE AND HANDLING OF
UNPROCESSED AND PROCESSED MATERIAL. AT GAIL, PATA |
 |
GAIL/PATA/C&P/PSER/20018342/SR |
 |
1500 (IST) on 12th August, 2008 |
 |
| 112 |
 |
16th July, 2008 |
 |
PROCUREMENT OF DUAL AC CONTROLLER + INSTALLATION
|
 |
GAIL/BDA/08/024/3200045100/ID/05 |
 |
1400 (IST) on 06th August, 2008 |
 |
| 111 |
 |
16th July, 2008 |
 |
SUPPLY OF WIRELESS SYSTEM FOR INTEGRATION OF MOBILE AAMS |
 |
GAIL/PATA/C&P/PR 20018573/NM |
 |
1500 (IST) on 8th August, 2008 |
 |
| 110 |
 |
16th July, 2008 |
 |
RATE CONTRACT FOR LEL GAS CHECK |
 |
GAIL/PATA/C&P/SR 20018950/NM |
 |
1500 (IST) on 12th August, 2008 |
 |
| 109 |
 |
16th July, 2008 |
 |
SUPPLY OF SMOKE & HEAT DETECTOR REMOVAL KIT |
 |
GAIL/PATA/C&P/PR 20018933/NM |
 |
1500 (IST) on 08th August, 2008 |
 |
| 108 |
 |
16th July, 2008 |
 |
SUPPLY OF LIGHTING MATERIALS |
 |
GAIL/PATA/C&P/PR 20017164&17551/NM |
 |
1500 (IST) on 08th August, 2008 |
 |
| 107 |
 |
16th July, 2008 |
 |
AMC FOR
TELECOM SYSTEM AT CORPORATE OFFICE , NEW
DELHI , NBCC , ASIAD & SDA |
 |
GAIL/ND/HR-C&P/08/0020 |
 |
1400 (IST) on 06th August, 2008 |
 |
| 106 |
 |
16th July, 2008 |
 |
SERVICING AND OVERHAULING OF 1.6 MVA, 6.6 KV/415
VOLTS CROMPTON GREAVES MAKE POWER
TRANSFORMER AND OIL REPLACEMENT FOR 10 MVA, 132 |
 |
GAIL/VL/08/C059/3300025614/ELECT |
 |
1400 (IST) on 12th August, 2008 |
 |
| 105 |
 |
16th July, 2008 |
 |
SERVICE CONTRACT FOR RUNNING & MAINTANANCE OF INDUSTRIAL CANTEEN
AT GAIL, PATA |
 |
GAIL/PATA/C&P/PSER/20018761/SR |
 |
1500 (IST) on 08th August, 2008 |
 |
| 104 |
 |
16th July, 2008 |
 |
Hiring of Esteem on monthly basis for E&P Group |
 |
GAIL/ND/08/0014/3300025576/C&P/20018804 |
 |
1400 (IST) on 06th August, 2008 |
 |
| 103 |
 |
15th July, 2008 |
 |
SUPPLY OF PRESSURE GUAGES FOR SAFETY VALVE |
 |
GAIL/PATA/C&P/PR 20018960/NM |
 |
1500 (IST) on 08th August, 2008 |
 |
| 102 |
 |
15th July, 2008 |
 |
External (Third party) Safety Audit for the year 2008 |
 |
GAIL/KCS/09/C09/3300025605/F&S |
 |
1400 (IST) on 05th August, 2008 |
 |
| 101 |
 |
15th July, 2008 |
 |
SUPPLY OF SPARE TEMPERATURE SCANNER |
 |
GAIL/PATA/C&P/PR 20018879/NM |
 |
1500 (IST) on 08th August, 2008 |
 |
| 100 |
 |
15th July, 2008 |
 |
For Contract Services For
Hiring Of Vehicles For Vijaipur- Dadri Pipeline Project |
 |
GAIL/ND/C&P/PROJ/VDPL/08-013/11 |
 |
1400 (IST) on 05th August, 2008 |
 |
| 99 |
 |
15th July, 2008 |
 |
For Valve Required At GAIL, Mumbai |
 |
GAIL/MU/08/07/3200045092/PR20018581 |
 |
1400 (IST) on 07th August, 2008 |
 |
| 98 |
 |
15th July, 2008 |
 |
Procurement of Ultrasonic Thick Testing Meter And Coat Meter |
 |
GAIL/VL/08/M069/3200045047/F&S |
 |
1400 (IST) on 12th August, 2008 |
 |
| 97 |
 |
15th July, 2008 |
 |
Nucleonic Level Transmitters |
 |
GAIL/PA08/19034/3200044966/NM |
 |
1500 (IST) on 08th August, 2008 |
 |
| 96 |
 |
15th July, 2008 |
 |
Supply of Batteries |
 |
GAIL/PATA/C&P/PR 20017440/NM |
 |
1500 (IST) on 05th August, 2008 |
 |
| 95 |
 |
15th July, 2008 |
 |
For Providing Xerox Services At GAIL Lakwa |
 |
GAIL/LA/194/REV/3300025592/C&P/HR/ASB/ |
 |
1400 (IST) on 29th July, 2008 |
 |
| 94 |
 |
15th July, 2008 |
 |
For Annual Item Rate Contract For Instrumentation,
Telemetry & Telecom Maintenance Works At Receiving
Terminal And Sectionalising Valve Stations Under The
Jurisdiction Of Secunderabad O&M Base. |
 |
GAIL/RJVSP18500/3300025543/VS/VSPL/RTC |
 |
1400 (IST) on 30th July, 2008 |
 |
| 93 |
 |
15th July, 2008 |
 |
For Assistance In Mechanical Maintenance Activities
At GAIL LPG Receiving Terminal And At All The OMC Terminal
In And Around Cherlapally Within The Radius Of 3-4 Km |
 |
GAIL/RJVSP17547/3300025553/VS/VSPL/RTC |
 |
1400 (IST) on 30th July, 2008 |
 |
| 92 |
 |
15th July, 2008 |
 |
For Annual Item Rate Contract For Round The Clock
Electrical, Maintenance Works At Receiving Terminal And
Sectionalising Valve Stations Under The Jurisdiction Of
Hyderabad O&M Base |
 |
GAIL/RJVSP17399/3300025562/VS/VSPL/RTC |
 |
1400 (IST) on 30th July, 2008 |
 |
| 91 |
 |
15th July, 2008 |
 |
Procurement of Lighting Pole & Fixtures |
 |
GAIL/KCS/09/06 /3200045071/Elect |
 |
1400 (IST) on 05th August, 2008 |
 |
| 90 |
 |
14th July, 2008 |
 |
SPARES FOR SET UP OF PRIMARY MUX AT UPCOMING EOL-DT
|
 |
GAIL/JA/08/RM06/3200045049/RC/2008-09 |
 |
1400 (IST) on 05th August, 2008 |
 |
| 89 |
 |
14th July, 2008 |
 |
HOUSE KEEPING SERVICES FOR AGRA REGION
|
 |
GAIL/AG/08/0205/3300025564/KKD/C&P |
 |
1400 (IST) on 06th August, 2008 |
 |
| 88 |
 |
14th July, 2008 |
 |
Supply Of Cab-2 Catalyst (Qty.: 12 MT) |
 |
GAIL/PA08/17704/3200045037/SD |
 |
1500 (IST) on 05th August, 2008 |
 |
| 87 |
 |
14th July, 2008 |
 |
For Food Lighting Luminaries At Mumbai O&M |
 |
GAIL/MU/08/09/3200045060/PR20018766 |
 |
1400 (IST) on 01st August, 2008 |
 |
| 86 |
 |
14th July, 2008 |
 |
For Interiors and Partitions at GTI for shifting of O&M and zonal office
from hired primises at Crystall Mall to GTI, Jaipur (Part-I) |
 |
GAIL/FL-046/SER/3300025506/JPR/SER/C&P |
 |
1400 (IST) on 25th July, 2008 |
 |
| 85 |
 |
11th July, 2008 |
 |
For Hiring Of Vehicles For Pre-project Revenue Activities Of Vijaipur-dadri Pipeline Project Of GAIL (India) Limited |
 |
GAIL/VH/08/C065/3300025515/CONST |
 |
1400 (IST) on 22nd July, 2008 |
 |
| 84 |
 |
11th July, 2008 |
 |
Supply of Spares Drives |
 |
GAIL/PATA/C&P/PR 20017423/NM |
 |
1500 (IST) on 01st August, 2008 |
 |
| 83 |
 |
11th July, 2008 |
 |
Supply Of Battery |
 |
GAIL/PATA/C&P/PR 20017744/NM |
 |
1500 (IST) on 01st August, 2008 |
 |
| 82 |
 |
11th July, 2008 |
 |
Supply of Continuity Jumpers |
 |
GAIL/PATA/C&P/PR 20017636/NM |
 |
1500 (IST) on 01st August, 2008 |
 |
| 81 |
 |
11th July, 2008 |
 |
Supply of Winding Wires |
 |
GAIL/PATA/C&P/PR 20017932/NM |
 |
1500 (IST) on 01st August, 2008 |
 |
| 80 |
 |
11th July, 2008 |
 |
Supply of Lab Chemicals |
 |
GAIL/PATA/C&P/PR 20017357/AW |
 |
1500 (IST) on 29th July, 2008 |
 |
| 79 |
 |
11th July, 2008 |
 |
Procurement of ‘life Buoy’ |
 |
GAIL/US/08/P019/3200045031/FL-044/08-09 |
 |
1400 (IST) on 01st August, 2008 |
 |
| 78 |
 |
10th July, 2008 |
 |
Supply , Installation, Testing & Commissioning of Solar Water Heater |
 |
GAIL/VL/08/M054/3200045012/ELECT |
 |
1400 (IST) on 05th August, 2008 |
 |
| 77 |
 |
10th July, 2008 |
 |
For Repair Of Painting Of Peripheral Street Lighting |
 |
GAIL/HZR/FL-C16/3300025487/SG |
 |
1400 (IST) on 06th August, 2008 |
| -- |
 |
-- |
 |
Addendum No.1 |
 |
GAIL/HZR/FL-C16/3300025487/SG |
 |
1400 (IST) on 06th August, 2008 |
 |
| 76 |
 |
10th July, 2008 |
 |
Procurement Of V-belts/Timing Belts For GAIL, Pata |
 |
GAIL/PA08/18716/3200044989/KN |
 |
1500 (IST) on 29th July, 2008 |
 |
| 75 |
 |
10th July, 2008 |
 |
For Hiring of Tata Mobile/Mahindra for refilling of Halon, Jhabua |
 |
GAIL/SR20019031/3300025513/JHA/C17/08 |
 |
1400 (IST) on 21st July, 2008 |
 |
| 74 |
 |
10th July, 2008 |
 |
Supply, Installation Testing & Commissioning Of Solar Light System |
 |
GAIL/VL/08/M050/3200044992/ELECT |
 |
1400 (IST) on 05th August, 2008 |
 |
| 73 |
 |
10th July, 2008 |
 |
Procurement Of Tyres For Fire Tender – GAIL – Vijayawada |
 |
GAIL/VSVJ/19096/3200045000/ |
 |
1400 (IST) on 25th July, 2008 |
 |
| 72 |
 |
10th July, 2008 |
 |
For House Keeping & Horticulture Works In KG Basin Terminals |
 |
GAIL/08/RJ19184/3300025505/ |
 |
1400 (IST) on 25th July, 2008 |
 |
| 71 |
 |
10th July, 2008 |
 |
Procurement of Morpholine And Hydrazine Hydrate |
 |
GAIL/VL/08/M075/3200044878/OPS |
 |
1400 (IST) on 05th August, 2008 |
 |
| 70 |
 |
09th July, 2008 |
 |
Refurbishment of coating of common (ROU) with ONGCL Pipeline in Kadi Region |
 |
GAIL/BDA/18078//3300025478/C&P/WS010/8L |
 |
1400 (IST) on 31th July, 2008 |
 |
| 69 |
 |
09th July, 2008 |
 |
Procurement of Transformer Rectifier Unit |
 |
GAIL/BDA/08/017/3200044939/ID/02 |
 |
1400 (IST) on 29th July, 2008 |
 |
| 68 |
 |
09th July, 2008 |
 |
For Obstacle Crossing Permissions en-route Proposed Pipeline
Pararllel to Existing Dahej –Vijaipur Pipeline |
 |
GAIL/PARC/C&P/S&LR/2008006/08-09/AD |
 |
1400 (IST) on 25th July, 2008 |
| -- |
 |
-- |
 |
Corrigendum No.1 |
 |
GAIL/PARC/C&P/S&LR/2008006/08-09/AD |
 |
1400 (IST) on 25th July, 2008 |
 |
| 67 |
 |
09th July, 2008 |
 |
For Obstacle Crossing Permissions en-route Proposed Spurline
for Chainsa – Jhajjar-Hisar Pipeline |
 |
GAIL/PARC/C&P/S&LR/2008005/08-09/AD |
 |
1400 (IST) on 25th July, 2008 |
| -- |
 |
-- |
 |
Corrigendum No.1 |
 |
GAIL/PARC/C&P/S&LR/2008005/08-09/AD |
 |
1400 (IST) on 25th July, 2008 |
 |
| 66 |
 |
09th July, 2008 |
 |
Supply of Pumps |
 |
GAIL/ND/08/0017/3200044952/C&P/20018890 |
 |
1400 (IST) on 30th July, 2008 |
 |
| 65 |
 |
09th July, 2008 |
 |
For Printer Cartridges & Toners For IPS, Nasirabad |
 |
GAIL/JPR/NBD/04/3200044965/C&P/PR/08-09 |
 |
1400 (IST) on 25th July, 2008 |
 |
| 64 |
 |
09th July, 2008 |
 |
For Air Conditioning System Of Control Room Building At EOL Despatech Terminal, Jamnagar
|
 |
Bid Document No.: 05/51/23KF(EOL)/GAIL/001/AC R |
 |
1500 (IST) on 15th July, 2008 |
 |
| 63 |
 |
09th July, 2008 |
 |
Engagement of 3 Nos. Round the clock Para-Medical Staff for the
period of 1 (one) year at GAIL,Gandhar. |
 |
GAIL/GA/W2K8008/3300025477/C&P/HR/YS/ |
 |
1400 (IST) on 31th July, 2008 |
 |
| 62 |
 |
09th July, 2008 |
 |
Supply Of Various Types Printing & Stationery Items For
Brahmaputra Cracker & Polymer Ltd. (BCPL), Dibrugarh. |
 |
BCPL/C&P/2008/M/03/AB |
 |
1500 (IST) on 25th July, 2008 |
 |
| 61 |
 |
08th July, 2008 |
 |
Installation of UPS 2x80KVA,230V,I-Ph.at Jhabua. |
 |
GAIL/PR20018446/3400000272/JHA/C13/08 |
 |
1400 (IST) on 05th August, 2008 |
 |
| 60 |
 |
08th July, 2008 |
 |
Consultancy Services For Cost Records Of All
HVJ Units & LPG Plant At GAIL India Ltd. Vijaipur |
 |
GAIL/VH/08/C048/3300025465/F&A |
 |
1400 (IST) on 30th July, 2008 |
 |
| 59 |
 |
08th July, 2008 |
 |
For Refilling of C02 Cylinders And Services For Hydrotest on ARC Basis |
 |
GAIL/VL/08/M049/3400000261/F&S |
 |
1400 (IST) on 01st August, 2008 |
 |
| 58 |
 |
08th July, 2008 |
 |
Supply of Battery Charger For GAIL Pata |
 |
GAIL/PA08/18374/3200044821/SR(PTD) |
 |
1400 (IST) on 29th July, 2008 |
 |
| 57 |
 |
08th July, 2008 |
 |
Integrated Management system certification (ISO 14001:2004 &
OHSAS18001:2007 )For Tripura Natural Gas Pipe
Line System |
 |
GAIL/20018443PK/3300025339/AGT/03/P-23 |
 |
1400 (IST) on 18th July, 2008 |
 |
| 56 |
 |
08th July, 2008 |
 |
Hiring Contract Se |